CPCONG

cpcong case-study graph builder.

asunder.nlbnp.case_studies.cpcong.build_cpcong_graph(K, J, T)

Build a constraint graph for the multi-period capacity plannning with congestion effects (cpcong) problem.

Parameters:
  • K (Any) – Number of production units in problem instance.

  • J (Any) – Number of products in problem instance.

  • T (Any) – Number of time periods in problem instance.

Returns:

Computed result.

Return type:

Any